How we work
Before starting building any projects is required to follow a few more stages. Most projects need planning permission or a lawful certificate if you want to extend or alter the property's exterior.
-
Site survey- we doing a laser measurement of the site and convert it in CAD format.
-
Design-you will work with our design team to achieve your desired project. The period of the design is between 4-5 weeks. Where required our structural engineer will do the structural calculations.
-
Fresh Air-at this stage we could design for your the system of the supplying more fresh air into your property, bedrooms. We have a specialist team to supply this service for you.
-
Submission- when all plans are ready we prepare and submit your application for planning permission or permitted development. We then act on your behalf for the eight-week process responding to any enquiries and making sure that the application stays on track.
As a Contractor we build any types of Conversions Projects.
![Architecture Illustration](https://static.wixstatic.com/media/7fba3905ea184ee29642cf0def056821.jpg/v1/crop/x_197,y_16,w_5362,h_3807/fill/w_661,h_469,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Architecture%20Illustration.jpg)
Before starting the building process few more stages are required
-
Quotation- at this stage the estimated cost will be submitted for you to decide.
-
Programming- we will prepare a scheduled program for the works.
-
Party Wall agreement- we do not have party wall surveyors in the house but can recommend. This is a stage that can not be avoided in any case.
-
Contract and deposit- at this stage we will sign the contract and the first invoice of the deposit submitted.
-
Building Control- 5 days prior to the starting of the project the building control should be informed. We are comfortable to work with council building control as well as with private building control.
![Construction Pre-Planning](https://static.wixstatic.com/media/b31d0e84cb714761b2b1f06c305023c7.jpg/v1/fill/w_661,h_441,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Construction%20Pre-Planning.jpg)
This is the most important part that now will actually make a physical change of your property.
You will be introduced to the Project Manager and Site manager that will be with you for the entire project.
​
We will require a site visit every week to run through the completed stages of the project and issue an Interim Certificate that will follow with the payment for the completed works.
​
On completion will start as called the retention period between 3-6 months where you will point to us any snagging that must be adjusted.
​
​
​